Product Center
You are here: Home » Products » Vanadium Redox FLow Battery » Industry use » 1MW2MWH Vanadium Redox Flow Battery Energy Storage System VRFB ESS For Balancing Grid

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

1MW2MWH Vanadium Redox Flow Battery Energy Storage System VRFB ESS For Balancing Grid

1MW2MWH VRFB ESS For Balancing Grid
Availability:
Quantity:
  • VFB-1MW

  • VCEC

This proposal is designed for battery energy storage power stations uses PV panels. The role of the battery energy storage system(BESS) is peak shaving and  valley filling and smooth output to the grid by cooperating with the PV panels, reducing  the phenomenon of abandonment of light, and make full use of PV power. Operating Mode: PV+BESS 

1) At noon, the sunlight is full, photovoltaic energy is greater than the load demand,  PV is preferentially provided to the load, excess energy is stored in battery. 

2) In the morning and evening, the sunlight is weak, and the photovoltaic energy is  insufficient for the load demand. The battery supplements power supply to the load. 

3) At night, PV has no energy supply and the load is supplied by battery. The BESS is established on key equipment include VRFB battery with high safety and long cycling life, power control system (PCS). VRFB battery is  used as energy storage device or carrier; PCS can realize 2 functions: one is DC/AC  conversion in both directions, the other is electrical power flow controlling.

Previous: 
Next: 
Home
Sales Office:  Eurasian Plaza, No. 73 Sunshine New Road, Shizhong District, Jinan City, China   WhatsApp: +86-13805318726
Emailjrchina@aliyun.com 
                  richard@vcecenergy.com
    Tel: +86-18660157588 / +86-531-67811857
    
​Copyright © 2021 CEC Science & Technology Co., Ltd. Support by sdzhidian